WAILUKU-KAHULUI WWRF POND FORCE MAIN REPLACEMENT

 Wailuku-Kahului, HawaiÊ»i

This project involved providing all necessary materials and labor for the replacement of approximately 800 linear ft of 20-inch DI (Ductile Iron) pipe. This was replaced with around 800 ft of 20-inch C905 PVC (Polyvinyl Chloride) pipe, which will be buried, along with approximately 20 ft of 20-inch DI pipe as a riser.

​

The entirety of the work was conducted within the Wailuku-Kahului Wastewater Reclamation Facility. It required dewatering from both the Pond Effluent Station and the headworks structure as part of the project.